prev I next
160 College Street, Toronto I Shot inside one of the egg-shaped meeting rooms on the ground floor during construction. The sand and red dye were used for grouting the red tiles on the outside walls.
Posted Friday, June 09, 2006 Labels: construction, toronto
No comments:
Post a Comment