 Lower Simcoe Bridge, Toronto I Toronto is covered in about a metre of topsoil.  Below that you get clay.  Because of this every construction site turns into a muddy mess which never drains.
Lower Simcoe Bridge, Toronto I Toronto is covered in about a metre of topsoil.  Below that you get clay.  Because of this every construction site turns into a muddy mess which never drains.
Posted
Sunday, March 11, 2007
 
 Labels:
construction,
toronto
Labels:
construction,
toronto
No comments:
Post a Comment